湖南电力 ›› 2026, Vol. 46 ›› Issue (5): 121-126.doi: 10.3969/j.issn.1008-0198.2026.05.015

• 电力人工智能与数字化 • 上一篇    下一篇

新一代集控系统变压器油色谱AI预警技术

李竟成, 王立建, 张夏, 李傲伟   

  1. 国网浙江省电力有限公司杭州供电公司,浙江 杭州 310016
  • 收稿日期:2026-05-07 修回日期:2026-06-03 发布日期:2026-11-06
  • 通信作者: 李竟成(1994),男,工程师,硕士研究生,从事电力系统自动化技术研究工作。
  • 基金资助:
    国网浙江省电力有限公司科技项目(B311HZ25Z002)

AI Status Warning Technology for Transformer Oil Chromatography in Substation Centralized Monitoring System

LI Jingcheng, WANG Lijian, ZHANG Xia, LI Aowei   

  1. State Grid Hangzhou Power Supply Company, Hangzhou 310016, China
  • Received:2026-05-07 Revised:2026-06-03 Published:2026-11-06

摘要: 提出一种基于新一代集控系统的变压器油色谱状态预警、辅助决策方法。首先,设计新一代集控系统油色谱AI预警架构;其次,使用等距特征映射算法对采集的油色谱故障样本数据集进行非线性降维,基于加性高斯噪声增强故障样本数据集,从而增强AI预警模型鲁棒性;最后,将结果输入XGBoost算法训练,研判故障类型,由光明电力大模型进行语义解释、成因分析,并输出运维建议。在某供电公司新一代集控系统上试点运行所提方法,实验结果表明,该方法故障识别准确,查准率93.9%,查全率93.2%,F1值0.935,F1值比XGBoost、SVM、KNN、RF方法分别提升2.9、17.2、14.6、4.7个百分点,且光明电力大模型语义解释清晰,运维建议可行,可在相关领域进一步推广应用。

关键词: 新一代集控系统, XGBoost算法, 光明电力大模型, 油中溶解气体, Isomap算法

Abstract: This paper proposes a condition early warning and auxiliary decision-making method based on the substation centralized monitoring system. First, an AI early warning architecture for oil chromatography under the substation centralized monitoring system is designed. Second, the Isomap algorithm is applied to perform nonlinear dimensionality reduction on the collected oil chromatography fault sample dataset, and additive Gaussian noise is introduced for fault sample data augmentation to enhance the robustness of the AI early warning model. Then, the processed data are fed into the XGBoost algorithm for model training: the XGBoost algorithm identifies fault types, while the Guangming Electric Power large model provides semantic interpretation, cause analysis and corresponding operation and maintenance (O&M) suggestions. Finally, the proposed method is launched for pilot operation on a new generation of centralized control system of a certain power supply company. Experimental results show that the method achieves reliable fault identification performance, with a precision of 93.9%, a recall of 93.2%, and an F1 score of 0.935. The F1 score is 2.9, 17.2, 14.6, and 4.7 percentage points higher than that of XGBoost, SVM, KNN, and RF methods, respectively. Moreover, the semantic interpretation of Guangming Power's large model is clear, and the operation maintenance suggestions are feasible, which can be further promoted and applied in related fields.

Key words: substation centralized monitoring system, XGBoost algorithm, guangming electric power model, dissolved gases in oil, Isomap algorithm

中图分类号: