Research on Source-Grid-Load-Storage Coordinated Planning Model of Rural Integrated Energy System Considering Demand Response

LIU Ying1, SONG Limin1, GONG Qiang1, LYU Sen1, CHEN Sen1, XIE Ning2   

  1. 1. State Grid Zhumadian Power Supply Company, Zhumadian 463000,China;
    2. School of Electronic Information and Electrical Engineering,Shanghai Jiao Tong University, Shanghai 200240,China
  • Received:2023-03-14 Revised:2023-04-24 Online:2023-06-25 Published:2023-06-25

Abstract: In order to promote the integrated development of source, grid, load and storage of integrated energy system, promote the clean transformation of integrated energy system, and meet the requirements of“low fossil energy consumption and high energy utilization efficiency”of integrated energy system for the transformation and upgrading of the energy industry, a coordinated planning model of source, grid, load and storage of rural integrated energy system is proposed. Compared with the traditional integrated energy system planning method, the role of demand response and energy storage in improving the energy efficiency of the integrated energy system is considered, and the carbon emission cost of the system is considered to improve the carbon reduction benefit. Taking a rural integrated energy system in Zhejiang province as an example, a case study is carried out, and the simulation results are compared with the original energy consumption and carbon emissions, and it is concluded that the proposed integrated energy system source-grid-load-storage coordinated planning model has good effects in reducing system energy consumption and reducing system carbon emissions, and the proposed coordinated planning method has good practical application value.

Key words: integrated energy systems, source-grid-load-storage, demand response, coordinate planning