[1] 郑敏嘉,吴伟杰,李逸欣,等. 广东电力碳达峰路径研究[J]. 广东电力,2023,36(1):29-34. [2] 姚福明,廖逸犇,史云翔,等. 考虑水光互补系统参与电力辅助服务的短期优化调度[J]. 现代电力, 2023,40(5):706-714. [3] 韩晓言,丁理杰,陈刚,等. 梯级水光蓄互补联合发电关键技术与研究展望[J]. 电工技术学报,2020,35(13):2711-2722. [4] CHAUDHARY P,RIZWAN M.Energy management supporting high penetration of solar photovoltaic generation for smart grid using solar forecasts and pumped hydro storage system[J]. Renewable Energy,2018,118:928-946. [5] 新华社. 中华人民共和国国民经济和社会发展第十四个五年规划和2035年远景目标纲要[J]. 中国水利,2021(6):1-38. [6] 刘树桦,王建学,李清涛,等. 多能互补复合电站的优化配置及其在系统电源规划中的应用[J]. 电网技术,2021,45(8):3006-3014. [7] 曹辉,武云霞,梁志明,等. 梯级水电站水光互补系统调峰运行方式研究[J]. 水力发电,2023,49(1):73-78. [8] 罗彬,陈永灿,刘昭伟,等. 梯级水光互补系统最大化可消纳电量期望短期优化调度模型[J]. 电力系统自动化,2023,47(10):66-75. [9] LI A Q,WANG L P,LI J Q,et al.Application of immune algorithm-based particle swarm optimization for optimized load distribution among cascade hydropower stations[J]. Computers & Mathematics with Applications,2009,57(11-12):1785-1791. [10] LIU B N,ZHOU J Z,GUO W C,et al.A many-objective optimization strategy for unified optimal operation of pumped storage hydropower station under multiple load rejection conditions[J]. Energy for Sustainable Development, 2023,74:34-49. [11] WANG C,JIANG Z Q, XU Y C,et al.Discussion on the monotonicity principle of the two-stage problem in joint optimal operation of cascade hydropower stations[J]. Journal of Hydrology,2023,623:129803. [12] 杨慢慢. 抽水蓄能电站的最佳调度方案研究[D]. 北京:华北电力大学,2012. [13] LIU J F,LI D F,WU Y,et al.Lion swarm optimization algorithm for comparative study with application to optimal dispatch of cascade hydropower stations[J]. Applied Soft Computing,2020,87:105974. [14] 赵夏,湛洋,陈仕军. 基于动态廊道遗传算法的流域梯级水电站厂间负荷分配研究[J]. 水力发电,2019,45(10):88-92. [15] LU N,WANG G Y,SU C G,et al.Medium-and long-term interval optimal scheduling of cascade hydropower-photovoltaic complementary systems considering multiple uncertainties[J]. Applied Energy,2024,353:122085. [16] MOHAMMADI-IVATLOO B,ZAREIPOUR H,AMJADY N,et al.Application of information-gap decision theory to risk-constrained self-scheduling of GenCos[J]. IEEE Transactions on Power Systems,2013,28(2):1093-1102. [17] NOJAVAN S,ZARE K,FEYZI M R.Optimal bidding strategy of generation station in power market using information gap decision theory(IGDT)[J]. Electric Power Systems Research,2013,96:56-63. [18] WU Y,SU C G,LIU S Q,et al.Optimal decomposition for the monthly contracted electricity of cascade hydropower plants considering the bidding space in the day-ahead spot market[J]. Water,2022,14(15):2347. [19] 徐建新,孙纬,马超. 基于改进粒子群算法的无人机三维路径规划[J]. 电光与控制,2023,30(6):15-21,106. [20] WU J M,LIN W Y,HUANG K W,et al.On the design of searching algorithm for parameter plateau in quantitative trading strategies using particle swarm optimization[J]. Knowledge-Based Systems,2024,293:111630. [21] ZHAO C,WANG F,JIANG X X,et al.Thermal parameter identification of concrete dams based on hybrid particle swarm optimization using distributed optical fiber monitoring data[J]. Swarm and Evolutionary Computation,2024,87:101582. [22] PANG H,CHEN K Q,GENG Y F,et al.Accurate capacity and remaining useful life prediction of lithium-ion batteries based on improved particle swarm optimization and particle filter[J]. Energy,2024,293:130555. [23] WU Y F,BAI Y,YANG S,et al.Extracting random forest features with improved adaptive particle swarm optimization for industrial robot fault diagnosis[J]. Measurement,2024,229:114451. |