湖南电力 ›› 2024, Vol. 44 ›› Issue (3): 126-135.doi: 10.3969/j.issn.1008-0198.2024.03.018

• 经验与探讨 • 上一篇    下一篇

源荷储一体化园区资源优化配置及其参与现货交易报价策略

周煜1, 吴海燕1, 齐俊丽1, 陈曦宇3, 项胜2, 刘玉青2   

  1. 1.国网湖南综合能源服务有限公司,湖南 长沙 410007;
    2.长沙理工大学电气与信息工程学院,湖南 长沙 410114;
    3.国网益阳供电公司,湖南 益阳 413000
  • 收稿日期:2024-01-29 修回日期:2024-03-18 出版日期:2024-06-25 发布日期:2024-07-10
  • 通信作者: 刘玉青(2005),男,硕士,主要研究方向为电力市场、需求响应。
  • 作者简介:周煜(1989),女,硕士,助理经济师,主要研究方向为城市规划与设计。吴海燕(1988),女,硕士,中级会计师,主要研究方向为会计。齐俊丽(1992),女,本科,工程师,主要研究方向为新兴业务发展。陈曦宇(1993),男,本科,工程师,主要研究方向为新兴业务发展。项胜(1989),男,博士,讲师,主要研究方向为需求响应、分布式能源系统、电力市场。
  • 基金资助:
    国家自然科学基金项目(72201041);湖南省自然科学基金项目(2023JJ40046);湖南省教育厅优秀青年项目(21B0334);教育部“春晖计划”(202202173)

Optimized Allocation of Source-Load-Storage-Integrated Park Resource and Its Offer Strategy of Participation in Spot Trading

ZHOU Yu1, WU Haiyan1, QI Junli1, CHEN Xiyu3, XIANG Sheng2, LIU Yuqing2   

  1. 1. State Grid Hunan Integrated Energy Service Company Limited, Changsha 410007, China;
    2. School of Electric and Information Engineering,Changsha University of Science and Technology, Changsha 410114, China;
    3. State Grid Yiyang Power Supply Company, Yiyang 413000, China
  • Received:2024-01-29 Revised:2024-03-18 Online:2024-06-25 Published:2024-07-10

摘要: 目前源荷储一体化园区资源配置考虑因素单一、市场交易策略灵活性不足,难以满足新型电力系统建设需要。为此,研究源荷储一体化园区资源优化配置及其参与现货交易报价策略。首先分析园区的灵活调节特性,并提出园区参与现货市场交易的框架。其次,综合考虑经济性能和绿色低碳指标,构建现货市场下的园区双层配置模型:上层模型以园区建设成本最小为目标,优化园区风光和储能容量的配置;下层模型以园区购电成本最小为目标,优化园区的购售电策略、储能和柔性负荷运行策略。最后,设置典型场景进行优化计算,仿真结果表明:相比于不参与现货市场的园区,参与现货市场的园区的资源配置与资源调控策略更加灵活,园区年总建设成本降低了2.86%,日总购售电成本降低了17.34%。

关键词: 源荷储一体化园区, 资源优化配置, 现货市场交易策略, 资源调控策略

Abstract: :At present,the resource allocation of the source-load-storage integration park has a single consideration, and the market trading strategy is not flexible enough, which makes it difficult to meet the needs of the new power system construction. For this reason, this paper studies the optimal allocation of resources in a source-load-storage integrated park and its participation in spot trading offer strategy.Firstly,the flexible adjustment characteristics of the park are analyzed, and a framework for the park's participation in spot market transactions is proposed. Second,a two-layer configuration model of the park under the spot market is constructed by comprehensively considering the economic performance and green and low-carbon indicators. The upper-layer model optimizes the allocation of wind and energy storage capacity of the park to minimize the construction cost of the park. The lower-layer model optimizes the power purchase and sale strategy, energy storage, and flexible load operation strategy of the park to minimize the power purchase cost of the park. Finally, a typical scenario is set up for optimization calculation, and the simulation results show that, the park participating in the spotmarket compared with the park not participating in the spot market, the resource allocation and resource regulation strategy of the park is more flexible, the annual total construction cost of the park is reduced by 2.86%, and the daily total cost of power purchase and sale is reduced by 17.34%.

Key words: source-load-storage integrated park, optimization of resource allocation, spot market trading strategy, resource regulation strategy

中图分类号: