Hunan Electric Power ›› 2023, Vol. 43 ›› Issue (2): 112-116.doi: 10.3969/j.issn.1008-0198.2023.02.019

• Experience and Discussion • Previous Articles     Next Articles

Analysis on Influence of Separate Operation of 500 kV Bus of UHV Xiaoxiang Station on Hunan Power Grid

LIU Yongyan1, GAN Wangwei1, ZHANG Yan2, XIAO Pei3, CUI Ting1, GUO Hu1   

  1. 1. State Grid Hunan Electric Power Company Limited Research Institute, Changsha 410208,China;
    2. State Grid Huaihua Power Supply Company,Huaihua 418000,China;
    3. State Grid Hunan Electric Power Company Limited,Changsha 410004, China
  • Received:2022-11-22 Revised:2023-02-16 Online:2023-04-25 Published:2023-05-06

Abstract: After the commissioning of the 1 000 kV UHV AC double-circuit line from Xiaoxiang—Ganjiang, the reactive power support capability of the inter-provincial AC channels has been enhanced, and the system stability has been enhanced, but it also leads to the increase of the system short-circuit current. In order to ensure the transient voltage stability of Hunan power grid, it is still necessary to put forward the requirements for the start-up and rotation of units in the province, which limits the power supply capacity and operational flexibility of the power grid. Aiming at this problem, the optimization of 500 kV grid structure in Hunan power grid is studied, and the optimization scheme of 500 kV bus-bar operation in UHV Xiaoxiang station is put forward to reduce the impact of near-area short-circuit fault on the system. It can improve the transient voltage stability level and the power supply capacity of power grid, and provide technical support for the safe and stable operation of Hunan power grid.

Key words: UHV AC, transient voltage stability, external power receiving capacity, grid structure optimization