Hunan Electric Power ›› 2022, Vol. 42 ›› Issue (2): 85-88.doi: 10.3969/j.issn.1008-0198.2022.02.016

• Experience and Discussion • Previous Articles     Next Articles

Algorithm Optimization Study on Linearity Error of High-Voltage Switch Cabinet Partial Discharge Detection Equipment

HU Sukai1, WANG Yuwei2, TANG Yongming3, WANG Lirong4, LI Xin2, XIAO Jing2   

  1. 1. Guangdong Power Grid Co., Ltd., Guangzhou 510600, China;
    2. State Grid Hunan Electric Power Company Limited Research Institute, Changsha 410007, China;
    3. State Grid Huaihua Power Supply Company, Huaihua 418000, China;
    4. State Grid Hunan Electric Power Company Limited Extra High Voltage Substation Company, Changsha 410004, China
  • Received:2022-02-28 Revised:2022-03-14 Published:2025-08-05

Abstract: Checking and comparing the hardware performance indexes of high-voltage switch cabinet on-line detection equipment, such as linearity error and stability, is the prerequisite for carrying out on-line detection. According to the field application requirements of on-line detection equipment of high-voltage switch cabinet, the least square method is used to optimize the linearity error algorithm. The theoretical and practical results show that the optimized algorithm can improve the accuracy of linearity error calculation, so as to realize the accurate verification and comparison of on-line detection equipment.

Key words: switch cabinet, partial discharge, live detection, linearity error, algorithm optimization

CLC Number: