Uninterruptible Installation Method of High Voltage Circuit Breaker Online Monitoring Equipment

CHEN Hao1, TAN Fenglei2, XU Peng2, ZHANG Haihua1, HE Jiahong3   

  1. 1. State Grid Jiangsu Electric Power Co., Ltd., Nanjing Power Supply Branch Company, Nanjing 210019, China;
    2. State Grid Jiangsu Electric Power Co., Ltd., EHV Branch Company,Nanjing 211102, China;
    3. Department of Electrical Engineering, Southeast University, Nanjing 210096, China
  • Received:2022-08-03 Revised:2022-08-30 Online:2022-12-25 Published:2023-01-13

Abstract: Considering lack of evaluation criteria for image recognition algorithm of device defects in substation,a novel uninterruptible installation method for HV breaker online monitoring equipment is proposed in this paper and the installation without interruption of power supply is achieved. The installation in the 500 kV substation in Jiangsu province verifies the efficiency and feasibility of this installation method.

Key words: high voltage circuit breaker, online monitoring, intelligent maintenance, installation method