湖南电力 ›› 2026, Vol. 46 ›› Issue (5): 85-94.doi: 10.3969/j.issn.1008-0198.2026.05.011

• 新能源发展与应用 • 上一篇    下一篇

含分布式光伏新型农村电网集中式充电设施选址定容建模与优化

赵邈, 段绪金, 向红, 谢晋安, 彭思敏, 李金亮   

  1. 国网湖南省电力有限公司电力科学研究院,湖南 长沙 410208
  • 收稿日期:2026-03-30 修回日期:2026-08-31 发布日期:2026-11-06
  • 通信作者: 赵邈(1990),男,硕士,主要研究方向为配电网规划、电动汽车充电设施、分布式光伏并网技术。
  • 基金资助:
    国网湖南省电力有限公司科技项目(5216A524001T)

Siting and Sizing Modeling and Optimization of Centralized Charging Facilities in Novel Rural Distribution Networks with Distributed Photovoltaics

ZHAO Miao, DUAN Xujin, XIANG Hong, XIE Jin’an, PENG Simin, LI Jinliang   

  1. State Grid Hunan Electric Power Company Limited Electric Power Research Institute, Changsha 410208, China
  • Received:2026-03-30 Revised:2026-08-31 Published:2026-11-06

摘要: 为应对湖南新型农村电网分布式光伏高渗透与电动汽车充电需求激增的双重挑战,提出一种计及电压质量、网络损耗、分布式光伏消纳及无功优化的选址、定容、运行校核分阶段协同优化模型。该模型将规划决策与运行模拟解耦:上层以全社会年综合成本最小为目标,统筹经营成本、用户时间成本与光伏消纳成本;下层以网损和电压偏差最小为目标,对规划方案进行无功校核。为实现农村分散负荷场景下的高效求解,采用动态分区与多目标归一化相结合的集成策略,并引入改进粒子群算法进行迭代寻优。以湖南某县域新规划区为案例开展验证,优化结果表明:当建设5座充电站时,全社会年综合成本最低,为529.45万元;经下层无功优化后,系统有功网损降低36.28%,最大电压偏移量下降58.8%,光伏就地消纳能力显著提升。

关键词: 新型农村电网, 分布式光伏, 充电设施, 选址定容, 多目标优化, 改进粒子群算法

Abstract: Facing the dual challenges of high penetration of distributed photovoltaic (PV) generation and surging electric vehicle (EV) charging demand in Hunan’s new-type rural distribution networks, this paper proposes a phased collaborative optimization model integrating siting, sizing, and operational verification, which explicitly accounts for voltage quality, network loss, PV accommodation, and reactive power optimization. The proposed model decouples planning decisions from operational simulations: the upper-level layer minimizes the total annual social cost, including operating costs, user time costs, and PV curtailment penalties; the lower-level layer performs reactive power verification for the planning schemes by minimizing network losses and voltage deviations. To achieve efficient solution under rural dispersed load scenarios, an integrated strategy combining dynamic partitioning with multi-objective normalization is adopted, and an improved particle swarm optimization algorithm is introduced for iterative optimization. A case study is conducted on a newly planned rural area in a county of Hunan Province. The optimization results show that when five charging stations are constructed, the total annual social cost reaches its minimum of 5.2945 million CNY. After the lower-level reactive power optimization, the system active power loss is reduced by 36.28%, the maximum voltage deviation decreases by 58.8%, and the local PV accommodation capacity is significantly enhanced.

Key words: new-type rural power grid, distributed photovoltaic, charging facilities, site selection and capacity determination, multi-objective optimization, improved particle swarm algorithm

中图分类号: